
| Program Provider and Title | Date |
| RESOLUTIONS TO CONSTRUCTION PROBLEMS SESSION TWO | 2/2/2006 |
| SESSION 1: STATE CODE REVIEW AND PLAN APPROVAL | 2/2/2006 |
| MASTERFORMAT 2004 SPECIFICATIONS FOR STATE PROJECTS SESSION ONE | 2/2/2006 |
| NATIONAL CATHEDRAL OF SAINT PATRICK V DUBLIN (IRELAND) TOUR | 3/18/2006 |
| SEISMIC DESIGN FOR NON-STRUCTURED COMPONENTS | 4/10/2006 |
| ARCHITECTURE AS DEVELOPER: CREATING NEIGHBORHOODS W/NEW URBANIST PRINCIPILES | 5/16/2006 |
| SELECTING QUALITY PAINTS AND COATINGS USING MPI STANDARDS | 5/31/2006 |
| DESIGNING MAIN STREET: DESIGN CHARRETTE | 7/8/2006 |
| RESIDENTIAL CODES | 8/24/2006 |
| ERGONOMICS 101 | 8/31/2006 |
| WINDOW & DOOR SOLUTIONS: BALANCING PERF/AESTHETICS/BUDGET | 8/31/2006 |
| FUTURE OF CONSTRUCTION INDUSTRY: BIM INTEGRATING PRACTICE & PROJECT DELIVERY | 9/20/2006 |
| SYSTEM APPROACH TO THERMAL PERFORMANCE | 9/30/2006 |
| TEMPLE OF THE MEETING OF THE THREE (PURA SAMUAN TIGA) TOUR | 10/16/2006 |
| WINDOW & DOOR SOLUTIONS: BALANCING PERF/AESTHETICS/BUDGET | 10/31/2006 |
| DESIGN JURY PROCESS WITH JENNIFER YOOS AIA | 11/16/2006 |
| ATHENS ACROPOLIS THE PARTHENON: ARCHITECTURE STUDY & TOUR | 12/23/2006 |
| NATIONAL ARCHAEOLOGICAL MUSEUM OF ATHENS | 12/24/2006 |
| ARCHAEOLOGICAL SITE OF MYSTRAS GREECE | 12/27/2006 |
| MYCENAE GREECE ARCHITECTURAL STUDY TOUR | 12/30/2006 |
| AAMA 2605-98 SPEC | 2/28/2007 |
| WINDOWS – AN ENVIRONMENTAL PERSPECTIVE | 2/28/2007 |
| CREATING SUCCESS WITH EFFECTIVE PROPOSALS | 3/31/2007 |
| UNDERSTANDING CLIMATE CHANGE | 4/18/2007 |
| USE OF STILE AND RAIL CONSTRUCTION AND MDF IN DOOR DESIGN | 4/30/2007 |
| LEGIS. DAY PROGRAM SURPASSIBILITY: CREATING RESILIENT SOCIETY | 5/16/2007 |
| ROYAL CRESCENT BATH | 7/10/2007 |
| ROMAN BATHS | 7/10/2007 |
| BRITISH MUSEUM | 7/13/2007 |
| ROYAL BOTANICAL GARDENS | 7/14/2007 |
| HAMPTON COURT PALACE: DESIGN OVERVIEW | 7/15/2007 |
| TOWER OF LONDON DESIGN OVERVIEW | 7/16/2007 |
| SKARA BRAE: DESIGN OVERVIEW | 7/21/2007 |
| NEOLITHIC STRUCTURES ORKNEY ISLAND: DESIGN OVERVIEW | 7/22/2007 |
| ST MAGNUS CATHEDRAL AND BISHOPS PALACE KIRKWALL: DESIGN OVE | 7/23/2007 |
| EARLS PALACE BIRSAY: DESIGN OVERVIEW | 7/24/2007 |
| OHIO BUIDING CODE CH. 10 – MEANS OF EGRESS – PT. 1 | 8/31/2007 |
| OHIO BUILDING CODE CH. 3 5 & 6 | 8/31/2007 |
| OHIO BUILDING CODE CH. 9 FIRE PROTECTION SYSTEMS | 8/31/2007 |
| OHIO BUILDING CODE CH. 7 FIRE RESISTIVE-RATED CONSTRUCTION | 8/31/2007 |
| OHIO BUILDING CODE CH. 10 – MEANS OF EGRESS – PT. 2 | 8/31/2007 |
| GREEN MATERIAL SELECTION | 9/15/2007 |
| DESIGNING RAIN GARDENS | 9/15/2007 |
| OHIO BUILDING CODE CH. 11 ACCESSIBILITY | 9/30/2007 |
| OHIO BUIDING CODE CH. 34 EXISTING STRUCTURES/COMPLIANCE ALT | 9/30/2007 |
| KSA LECTURE SERIES – WORKS OF DAVID GORDON | 10/3/2007 |
| KSA LECTURE SERIES – WORKS OF K. MICHAEL HAYS | 10/10/2007 |
| NEXT ARCHITECT: A NEW TWIST ON THE FUTURE OF DESIGN | 10/18/2007 |
